Saturday, November 19, 2022

Wheels and brakes


 from 9/24/22

Well cowling hold down pins are in and done.

I cleaned up the inside fuselage area, like tying up wires, adjusting flap mechanism, installing alternate static switch, etc

Also re installed all instruments and completed panel.

Started on the wheels and brakes, hoping to get this thing to stand on its legs soon.

The brakes and wheels installation really took some research. Thanks to those who came before for posting.

And the second picture: Gear On!






No comments:

Post a Comment