Saturday, April 10, 2021

Instrumentation Continuing

 After 3 months of wiring, the instruments are nearly done. I figure there are a dozen computers to wire up with about 250 terminations. Nothing too hard, but it takes time. In final wire check of sub-panel, I found 3 miss wires out of about 250 terminations; not bad. (None of them were smoke producers, just data lines.)

I decided to add a CO detector at the last minute after watching a you tube video. This was easy since I had left service loops.

With the sub-panel wiring done, I am working on the cutting the instrument panel for all the switches and stuff.