Well, the last lines of the fuselage kit's instructions have been completed; I am calling the fuselage kit done. It doesn't look like much progress, but a ton of work and learning.
I added a doubler for the ELT antenna. It sounds simple, but took longer than expected. Everything else went OK. I had a really good bucking bar helper; I am not sure how anyone could do this alone.
It took me a little less than two years to complete the fuse. Seems for many others, the slow build fuse takes twice as long as the wings. It seems I am no exception to this rule.
I was able to attached the side braces on the bench before installing the turtle deck; I can't image doing this on the plane. Those elevator supports I built several years ago really came in handy.
Next up, the finishing kit, starting with the canopy.