Sunday, August 21, 2022

Cowling stuff

 I glued on the windscreen and aft canopy skirt with Sikaflex; This went as planned with no real drama.


I am working on the cowling now. I have the new nose gear, so the bottom is attached not with hinge material, but rather with screws into a plate. The sides and top still use the hinges.

I decided long ago that I would get the cowling and baffling done before putting the plane on the gear. So far the plan is working out well.

Today I drilled the bottom attachment screws 1/8" for cleco's. I will up drill for the 8-32 screws once every thing fits.

I found getting the front of the top and bottom sections trimmed and fitted was the secret to making the rear part line up correctly.

Attached is a picture of how I used a bottle jack to push everything into position to drill the bottom screw holes. Having the plane on a low stand, and not on the gear, really paid off.

I just need to do final trim on the fuse sides and the cowling sides, then install the hinges.

I will probably finish the baffles, the flap motor, elevator control linkages, and all the stuff inside before putting it on the gear.




No comments:

Post a Comment